Installation & Plant Startup Services

Installation And Startup Systems
Installation And Startup Systems

(Click on thumbnail to enlarge)

In support of our waste management systems and equipment, DustMASTER® Enviro Systems offers installation and startup services under the Plant Service and Installation (PSI) company division. This division focuses on starting up new plants, as well as the retrofitting and modernization of existing machinery and methods. We offer single source responsibility, incorporating all installation and maintenance services into one place. Also available are turnkey project management services and training, offered in a classroom environment or at the equipment. Reduced operating costs are realized with appropriate operator training and installation.

Our installations include single components, material handling equipment, and entire batch plants. We provide documentation including detailed price quotations, a plan of action explaining what is to be carried out, project schedules, drawings, operation and service manuals, and a spare parts list. We have an extensive inventory of spare parts with shipping in as little as one day. Other services include audits of existing equipment, service contracts, and additional training. For more information about the installation and maintenance of complex industrial plants and machinery, or the other value added capabilities available please see the table below or contact us directly.

Portfolio

Plant Installation & Startup Capabilities:

Services
Installation
Startup
New Plant
Modernizing an Existing Facility
Turnkey Project Management
Training
Benefits
Single Source Responsibility
Operator Training
Reduce Operating Costs Over Time
Training
Classroom
At the Equipment
Installation
Single Component
Material Handling Equipment
Entire Batch Plants
Documentation
Quotation
Detailed Plan of Action
Operation Manuals
Service Manuals
Project Schedules
Drawings
Spare Parts Lists
Additional Services
Audits of Existing Equipment
Service Contracts
Additional Training
Location
Nationwide (Installation)
Worldwide (Startup)
Testing
Leak
Run-In
Factory Acceptance
Material Test
Mixing
Moisture
Strength Analysis
Quality
Welding Certificates
Inspection Sheets
Production Volume
Prototype to Multiple Units
Lead Time
8 to 10 weeks (System)
4 to 6 weeks (Mixer)

Additional Information

Industry Focus
Cement Mills
Foundries
General Industry
Municipal Waste Facilities
Paper Manufacturing Plants
Steel Mills
Utilities
Environmental
Industrial
Power Plants
Landfills
Refractory
Biomass Waste Conditioning
Intended Applications
Alkaline By-Pass Dust
Cement Kiln Dust
Plant Dust/Waste Material
Process/Plant Sludge
Baghouse Dust
Heavy Metals
Shot Blast
Spent Foundry Sand
Wheelabrator Fines
Baghouse Powder Residue
General Material Mixing/Blending
Hazardous & Non-Hazardous Waste
Bottom Ash
Fly Ash
Iron Oxides
Calcium Oxide
Dust from Pyrites
Economizer Ash
Fly Ash from Eastern & Western Coals
Fly Ash from Fluidized Bed Boilers
Lignite
Foundry Dust
Mineral Dust
Powder River Basin Fly Ash
Waste To Energy
Industry Standards
American Foundry Society (AFS)
Lignite Energy Council
Portland Cement Association (PCA)
PRB Coal Users Group
ACAA
EPA
AWS Certified
DWG File Formats
Pro-E
AutoCAD

Back To Top

© 2013 DustMASTER® Enviro Systems , All Rights Reserved Site created by Thomas Web Solutions and powered by Navigator Platform