Biomass Power

Managing fly ash from waste incineration.


FLEXIBLE SYSTEM DESIGN MEETS DIVERSE NEEDS.

As direct combustion continues to be the most common method for converting biomass to energy, the industry faces ongoing requirements for managing fly ash byproduct. DustMASTER offers a range of systems to process fly ash into a low-moisture and dust-free material for safe transportation and land filling.

The DustMASTER system works extremely well with fly ash from waste wood, refuse-derived fuels and FBC boilers. PLC-based controls allow complete system flexibility for adjusting mixing times and water-to-fly ash ratios. Customers can choose from four different styles of mixers, along with material handling equipment, to suit their specific application.

From a complete load-out system to a mixer retrofit, DustMASTER offers a solution for your company. To learn more about how DustMASTER managed fly ash, please see the chart below or contact us directly.

PROJECT
HIGHLIGHTS

INDUSTRY

Biomass Power

SCOPE

Successfully process Biomass fly ash with water to achieve a dust-free product for landfill disposal.

PRODUCT

DustMASTER 80 TPH Series II batch mixing system with water metering

COMPONENTS
  • Turbin style pan mixer with hydraulically operated discharge door
  • Metered water system and contro
  • Programmable controller with 100% manual override and load cell readout
TESTING

Moisture percentage addition by weight to determine optimum proportion

TURNAROUND TIME

One week for testing and documenting results

DELIVERY LOCATION

Southern U.S.

OUTCOME

Final product was dust free with 16% water addition and a 60 second cycle time, the fly ash was acceptable for transport and landfill disposal.